Big Wins for the Utility Infrastructure Group

Hard work by the Utility Infrastructure Group is paying off with a wide variety of wins recently! The diverse set of storm water, drinking water and sewer infrastructure upgrades include, drinking water and wastewater treatment plant (WWTP) improvements, condition assessments, sanitary sewer model recalibration, designing a new lift station and force main, new pump installations, ground water well design and more! Not only are the projects showing off our wide skill set, but we are getting the opportunity to work with a wide variety of private, municipal, and industrial clients as well. Check out some of the projects below:

  • Evansville Advanced Facility Plan for the Integrated Overflow Control Plan
  • Portage Wastewater Treatment Plant Biosolids Design
  • Columbus Ohio Center Large Diameter Sewer Assessment
  • Elkhart Sanitary Sewer Model Recalibration
  • Century Acres WWTP Abandonment and Design of Pump Station and Force Main
  • Citizens Energy Group 2016 Lift Station Package
  • Indiana American Water Company – Margaret Avenue Water Main Relocation
  • Industrial Screener Design
  • Anderson Drinking Water Treatment Plant Upgrades
  • Speedway 72-inch Emergency Sewer Relocation
  • Rockville Sanitary Sewer Master Planning
  • Lawrence Municipal Utilities On-Call Sanitary Engineering
  • Fort Wayne CSO 055 Relief Sewer and CSO 032 Outfall Structure

Comments are closed.