Video Captures Beam Setting at Lanesville

American Structurepoint went the extra mile to create a time-lapse video of a beam setting at the Lanesville Phase 2A Connector Road project. Our client, the Harrison County Highway Department, asked for a video depicting beams being installed for a single-span I-beam bridge over the Norfolk Southern Railway. Field Manager Josh Culver set up a trail GoPro camera to capture photos that could be transformed into a video. Marketing Services Coordinator Krista Lawson worked her magic to create the video. Five bridge beams each weighing 76,000 pounds and 79-feet-long were installed over a four-hour period. Our video captures the action in 60 seconds. Construction will wrap up in July at Lanesville, for which we are providing both design and construction inspection services.

Comments are closed.